Examples

Finished work, with the run shown underneath

Pick a job. Read what came back, how long it took, what it cost, what choice was made on privacy and control, and how the output was checked. Then read the setup, if you want to rerun it yourself.

Every number below names its source. A result counts only if a stranger could repeat it.

Proof slot · empty

Measured results coming soon

First measured result: not measured yet.

Method

How each entry is made

  1. 01The job is run once, as written. Prompt, setup, hardware, runtime, model, and quant are recorded at the time of the run.
  2. 02Time and cost are taken from that run, not worked out later from spec sheets.
  3. 03The output is checked against a standard named in the entry. Fixes and reruns are written down.
  4. 04Each entry is marked "stock prompt" or "Sovrenly setup vN," so a tuned setup is never passed off as the plain one.
  5. 05The Lab Jobs row behind the entry is named on the page. No row, no number.

If a later run gives a worse result on the same setup, the entry is corrected and the change is dated.